Why per mile
Riverhead spends about 30% less per mile than the median Suffolk town. Spending at the median rate across its 206 miles would cost roughly $2,126,642 more a year than it currently spends on highways.
Every Suffolk town, Fiscal year 2025
Highway spending divided by locally maintained centerline miles.
What Riverhead’s highway money goes to
About 60% of it is wages. That is normal for a highway department and it is also why a per-mile figure moves more with staffing decisions than with how much asphalt got laid.
What this does and doesn’t tell you
Spending less per mile than your neighbours is not a result — it is a question. It can mean a lean, efficient operation, or it can mean roads are being allowed to degrade and the bill is being handed to a later budget. Nothing in these two datasets can distinguish those, because neither measures the condition of the pavement. The Town does not publish a pavement-condition rating, and until it does, a number like $23,595 a mile is a prompt to go and ask rather than an answer.
Limits of this comparison
- Low spending is not automatically good. Spending less per mile can mean an efficient operation or it can mean deferred maintenance, and this data cannot tell the two apart. Only pavement-condition ratings can, and Riverhead does not publish any.
- Centerline miles, not lane miles. A four-lane road counts the same as a two-lane road of equal length, so towns with wider roads look more expensive per mile than they are.
- The Highways category excludes employee benefits and debt service, which the Comptroller reports separately. The figures here are wages, contractual costs and equipment — not the full cost of running a highway department. Because every town is measured the same way, the comparison holds even though the absolute number understates.
- Airports, bus service, waterways and transportation facilities are excluded. They sit in the broader 'Transportation' function, and including them would badly distort East Hampton, which runs an airport.
- Villages maintain their own streets. Village roads and village spending are filed separately and are excluded from both sides here.
- The two sources are close in time but not the same: spending is fiscal 2025, and the road inventory is dated August 26, 2025. Road mileage moves slowly, so the match is close but not exact.
- A single year can mislead. A town that repaved heavily in 2025 looks expensive; one that deferred looks thrifty.
- The Comptroller's figures for 2025 are a snapshot of what towns filed, and can change as reports are reviewed or amended. This page is rebuilt from the newest snapshot every week.